Bangladesh's government has taken an in-principle decision to build a second Padma Bridge in a Y shape, linking Paturia in Manikganj, Daulatdia in Rajbari and Kazirhat in Pabna, according to the Bridges Division.

Plans for a second crossing over the Padma date back nearly three decades. Earlier proposals included a bridge between Paturia and Daulatdia, a tunnel beneath the riverbed, and a Rajbari–Pabna bridge without a direct link to Dhaka.

Officials say the new design would give Dhaka an alternative route to the north and south-west, and fresh links to Mongla seaport and the Benapole, Bhomra and Darshana land ports, cutting the time and cost of moving goods.

The government is also planning a second Jamuna Bridge, part of development plans centred on Bogura. The existing Jamuna Bridge, opened in 1998, carries about 25,000 vehicles a day and is often congested at festivals and weekends, while about 20,000 vehicles a day use the Padma Bridge, which opened in 2022.

The final locations, lengths, designs and costs of both bridges have not yet been decided. A new feasibility study is under way and is expected to be completed by September next year.

Source: Prothom Alo · Source date: 2026-11-17.

Report compiled by the SANn Asia desk from the linked source.

File photo: Bank of the padma river at Rajbari district Bangladesh.jpg — Shamim Ahammed sumon. Wikimedia Commons original · CC0. Resized; cropped in cards. Representative image, not a photograph of the reported event.